specguard Corporation SG-54 Premium Acrylic Coating

specguard Corporate Logo

(310) 834-7037

specguard Projects

Trinidad, California Pier Reconstruction Project (2011)
Premium grade modified acrylic roof coating systems.

Project Highlights



specguard SL-08 Marine Grade Slow Cure Polyurea was specified in the Trinidad, California Pier Reconstruction Project completed in late 2011. The project's objective was to correct the structural deficiencies of the pier and improve pier utilities for the benefit of the public.

The new design and construction will improve the water quality conditions and provide additional habitat for the biological community. specguard SL-08 Marine Grade Slow Cure Polyurea is an environmentally friendly product that has been specifically engineered and designed for the harsh marine environment.

The new steel pilings coated with SL-08 Marine Grade Slow Cure Polyurea replaced the original Douglas fir creosote treated pilings.